Onteora Scout Reservation Photo Album
Part 31 - Long House Kitchen Construction
October 2002

 

For those of us who attended the 2001 Alumni Weekend, it looked like there was little chance that the Long House kitchen would be in shape for next summer. The floor was uneven piles of dirt, and parts of the exterior wall were missing. Thanks to the continuing hard work by a band of dedicated volunteers significant progress has been made since then. The kitchen now sports a concrete floor and other essential pieces.

After the work at the Long House a camp inspection was held to make sure things were buttoned up for the winter. This included stops at the A-Frames and the new Dan Beard Shelter.

Thanks to whoever it was that sent me these pictures. Somehow I managed to lose your name, so please step forward and be identified!